In April 2007 Council embarked on the preparation of a Parks and Recreation Master Plan for the Town of Pasadena. TRACT Consultants were engaged to assist Council in this task. On the basis of a Public Survey, Stakeholder and Public meetings, SWOT analysis etc. a draft Parks and Recreation Master Plan was prepared by Tract. Additional work was undertaken by Atlantic Engineering Consulting Ltd. and presented in a report titled Town of Pasadena Recreation Centre - Space and Cost Considerations. Following extensive debate Council has adopted the TRACT Report Recommendations 5.1.2 to 5.1.10. With modifications, as outlined in Section 4.2.4 of its Strategic Planning Document, Council also endorses Recommendation 5.1.1 of the Tract Report. Following receipt of a revised floor plan for the proposed Recreation Centre, Council will proceed as outlined in Section 4.2.6 of the Strategic Planning Document.
Recreation Links
Oudoor Rink
Schedule
Winter Carnival Booklet
Town Crier
December 2008
House Decororating
contest winners
The Town of Pasadena wishes to advise residents and contractors that permits are required for the following:
Replacing roof shingles Building construction
Building renovations Building repairs
Building extensions Building relocation
Erection of fences and patios Operating quarry
Dismantle & removal of buildings Operating a business
Erection of portable garages/greenhouses
Backup valve must be installed on sewer lines.
Note: All new construction, renovations, extensions, etc., are subject to supplementary property assessments and taxation. These assessments are often not available until late in the year but are effective from the date of occupancy. The applicants should therefore be aware of, and budget for, the additional tax.
When footings have been framed, but before pouring, the Town must be provided with a location certificate confirming that setback, rearyard and sideyard comply with the Town’s regulations. Accessory buildings (garages, shed & etc.) are required a second inspection before the roof truss are installed to conform that the maximum height will not exceed Town Regulations.
Permits must be obtained before work commences.